Skip To

  • Skip to content
  • Jump to navigation
  • Search

Page Outlines

Loading...

    IE10 and below are not supported.

    Google Chrome Mozilla Firefox

    Contact us for any help on browser support

    Two people cycling on Santander Cycle Hire bikes

    You are here:

    • Home
    • Closed Projects
    • Lambeth Bridge to Chelsea Bridge walking and cycling changes
    Go Back

    Documents

    • document icon Interim findings report: CS8 Chelsea Bridge to Lambeth Bridge (849 KB) (pdf)
    • document icon Cycleway 8 Westminster overview map (113 KB) (pdf)
    • document icon Cycleway 8 Westminster layout maps (546 KB) (pdf)
    • document icon About this consultation (84.7 KB) (pdf)
    • document icon Changes in summary between Lambeth Bridge and Chelsea Bridge (103 KB) (pdf)
    • document icon Easy read text (5.5 MB) (pdf)
    • document icon Easy read survey (4.1 MB) (pdf)
    • document icon Cycleway 8 consultation survey (130 KB) (pdf)
    • document icon How will we know if the experiment is a success? (131 KB) (pdf)
    • document icon Cycleway 8 announcement of intention to retain scheme (October 2021) (438 KB) (pdf)
    • document icon Construction letter 7 December 2021 (183 KB) (pdf)
    • document icon Construction letter 25 February 2022 (95.8 KB) (pdf)
    • document icon Lambeth Bridge to Chelsea Bridge consultation report (1.64 MB) (pdf)

    About TfL

    Information for...

    • Media
    • Greater London Authority
    • Mayor of London
    • London Assembly
    • London and Partners
    • Metropolitan Police Service
    • London Fire and Emergency Planning Authority
    • The Mayors Office of Policing and Crime
    • London Legacy Development Corporation
    • Terms and Conditions
    • Privacy Policy
    • Website accessibility
    • Moderation Policy
    • Technical Support
    • Cookie Policy
    • Site Map
    • Copyright TfL
    • Powered by EngagementHQ