Search results
Results with 中航机遇领航C2026年1月基金分析报告
Page 5 of 15. Found 144.
Ask us a question
As part of Phase 1 of the scheme in 2021, we added a cycle Advanced Stop Line on the northbound approach of the bridge, alongside reducing the speed limit to 20mph.
Noise
Table 1 below provides a breakout of the level of change.Table 1 number of changes in noise levels.
Ask us a question about this scheme
The plans for phase 1 included a proposal to close the northbound slip road from Angerstein roundabout towards Blackwall Tunnel. This is a shortcut used by motorists to avoid queuing traffic on the A102. Why was that work not done?
Review of taxi (black cab) fares and tariffs 2025
options for the minimum fare and Tariffs 1, 2 and 3 and would like to hear your views on these.We want you to rank the options below, you can let us know what you think by completing our survey.Option ATariffs 1, 2 and 3 increased by total Cost Index
1) Why are you consulting on a change to route 108
Although these proposals are predominantly about the Silvertown Tunnel bus network, the Development Consent Order (DCO) that granted permission to build the Silvertown Tunnel requires that we must provide a minimum of 20 buses per hour at peak times across both the Silvertown and Blackwall Tunnels combined.Currently, route 108 is the only bus route that crosses the river east of Tower Bridge and as such forms a key part of the cross-river bus network in East London. We propose to keep route 108 much as it is, travelling via the Blackwall Tunnel. However, as part of the construction of the Silvertown Tunnel, the opportunity will arise to use a new slip road as it exits the southern end of the Blackwall Tunnel. This will speed up the journey to North Greenwich station. It is this minor re-routeing that we are consulting on.
What is the Mayor and TfL doing to improve public transport and active travel in outer London?
Planned enhancements to the London Overground with new rolling stock, and the DLR with new trains, will deliver additional benefits to outer London.We are also investing in active travel improvements in outer London, including Cycleway 1 between Enfield
What evidence do we have that lowering speed limits has worked elsewhere and has worked since implementation?
Collision monitoring data collected from 1 May 2020 to 30 June 2022, after Phase 1 of Lowering Speed Limits, were compared to a similarly seasonally-matched period before 20mph speed limits were introduced in the central London Congestion
Improving safety at East Sheen village
metre, add 1 metre planting and remove railings: We're widening the pavement from 1.85 metres to 2.9 metres, and adding 1 metre plant border.
Review of taxi (black cab) fares and tariffs 2024
the minimum fare by 40 pence to £4.20Tariffs 1, 2 and 3We are considering seven options for Tariffs 1, 2 and 3 and would like to hear your views on what we should do so.
Capital Call service review
These will be 1:1 sessions held with the project team on Microsoft Teams, Zoom or by phone as needed.Please email us at haveyoursay@tfl.gov.uk to request an appointment at a time suitable for you and we will get back to you to confirm this.Drop-in events

