Walking and cycling improvements between Wembley Central and Harlesden stations

Share Walking and cycling improvements between Wembley Central and Harlesden stations on Facebook Share Walking and cycling improvements between Wembley Central and Harlesden stations on Twitter Share Walking and cycling improvements between Wembley Central and Harlesden stations on Linkedin Email Walking and cycling improvements between Wembley Central and Harlesden stations link

Update 22 December 2023

This consultation has now closed. Thank you to everyone who responded. We are analysing your feedback and will report back shortly.

-update ends-

image of Harrow Road and A406 junctionLarger imageOn this page you can read how we are proposing to improve walking and cycling between Wembley Central and Harlesden stations and how you can have your say.

You have until 21 December 2023 to give us your feedback.






Background

What are the proposals?

Summary of changes

How you can find out more

Tell us your views

What happens next



Background

Image of Brentfield and First Drive junctionLarger image

We have been working closely with Brent Council since April 2019 to develop a project that would make it safer and easier for local people to walk and cycle between Wembley and Willesden Junction.

We are developing the project in phases, and the first phase will focus on the area between Wembley Central and Harlesden stations, where we propose to provide a new high-quality Cycleway and improvements for pedestrians.

The changes would make streets in the area safer and more pleasant by enabling people to walk and cycle more and drive less.

The proposals include a protected two-way cycle lane on the A404 Harrow Road and Brentfield, new and improved cycle and pedestrian crossings over Harrow Road, better street lighting to help make the area feel safer and more trees and plants more welcoming.

This would help us to reduce air pollution and carbon emissions, which could improve local people’s health. It would also address congestion, and help support new developments planned across the wider area by providing better walking and cycling links to local businesses and stations.

Find out more about the background to our proposals.


What are the proposals?

Image of Brentfield by Bridge Park Leisure CentreLarger image














The changes we would like to make are:

  • Introducing a new protected two-way cycle lane on the A404 Harrow Road and Brentfield between Sylvia Gardens and First Drive, with separate low level cycle signals at junctions, new cycle crossings and better connections to other local cycle routes
  • Introducing bus stop bypasses for cyclists at bus stops C and K, with the two-way cycle lane behind the bus stop island for cyclist safety

  • Improving the quiet road cycle connections to Wembley Central and Harlesden stations

  • Improving the route for pedestrians by adding a new crossing over Brentfield near Bridge Park Community Leisure Centre and making existing crossings at the A406 junction more direct, which will reduce crossing times

  • We’ll add measures to slow traffic speeds, add better street lighting and drainage, and new areas of planting and trees where space allows along the route

  • Improving the service for bus passengers by extending bus stop D so two buses can stop here at a time, and moving stop B in line with the traffic lane so that buses can pull away easily after passengers board

  • Other changes to allow us to make these improvements include closing the left turn filter lanes from the A406 onto Harrow Road and Brentfield, making Sylvia Gardens exit only for motor vehicles (currently entrance only), shortening a parking bay on Harrow Road and reviewing parking restrictions on the quiet road connections. We would also move bus stop ‘Sunny Crescent’ 90m to the eastern side of Wyborne Way to make space for the new cycle lanes

To read about the changes we plan to make in more detail, please see summary of changes page.


How you can find out more

We would like to know what you think about our proposals. The information below is available to help you respond:

If you need to translate this page into another language, please use the ‘Select language’ button at the bottom of this page.


Drop-in events

We will be holding two in person drop-in events at Bridge Park Community Leisure Centre, Brentfield, Harrow Road, London NW10 ORG on:

  • Saturday 9 December (10:00 - 14:00)
  • Tuesday 12 December (15:00 - 19:00)

These will give you an opportunity to get further information about the proposals and provide your thoughts and feedback, to allow us to consider your views.


Equalities Impact Assessment

Our Equality Impact Assessment (EqIA) identifies:

  • The affects these proposals could have on people
  • How we propose to minimise any negative impacts

After we’ve considered all comments, the EqIA will be reviewed and may be updated.

We use the EqIA to help us decide if, and how, we should proceed with these proposals.


Connecting with London's deaf community on our consultations

British Sign Language videos of the proposals and survey are available.

To further enhance how we engage and consult with London's deaf community we are trialling a British Sign Language (BSL) consultation conversation service for this consultation. This service will allow the TfL consultation lead to have a two-way BSL translated discussion on any aspect of this consultation with a BSL speaker.

To request a BSL consultation conversation please contact us at haveyoursay@tfl.gov.uk and we will be in contact to arrange this at a convenient time. Following this trial, we will evaluate the service to determine if this is something we are able to offer on other consultations in the future.


What happens next

These proposals are subject to the outcome of our consultation. Once consultation ends on 21 December 2023, we will spend time considering all the responses we receive and will prepare a consultation report.

The report will be available to everyone that takes part in the consultation and a copy will be published on our website.



Update 22 December 2023

This consultation has now closed. Thank you to everyone who responded. We are analysing your feedback and will report back shortly.

-update ends-

image of Harrow Road and A406 junctionLarger imageOn this page you can read how we are proposing to improve walking and cycling between Wembley Central and Harlesden stations and how you can have your say.

You have until 21 December 2023 to give us your feedback.






Background

What are the proposals?

Summary of changes

How you can find out more

Tell us your views

What happens next



Background

Image of Brentfield and First Drive junctionLarger image

We have been working closely with Brent Council since April 2019 to develop a project that would make it safer and easier for local people to walk and cycle between Wembley and Willesden Junction.

We are developing the project in phases, and the first phase will focus on the area between Wembley Central and Harlesden stations, where we propose to provide a new high-quality Cycleway and improvements for pedestrians.

The changes would make streets in the area safer and more pleasant by enabling people to walk and cycle more and drive less.

The proposals include a protected two-way cycle lane on the A404 Harrow Road and Brentfield, new and improved cycle and pedestrian crossings over Harrow Road, better street lighting to help make the area feel safer and more trees and plants more welcoming.

This would help us to reduce air pollution and carbon emissions, which could improve local people’s health. It would also address congestion, and help support new developments planned across the wider area by providing better walking and cycling links to local businesses and stations.

Find out more about the background to our proposals.


What are the proposals?

Image of Brentfield by Bridge Park Leisure CentreLarger image














The changes we would like to make are:

  • Introducing a new protected two-way cycle lane on the A404 Harrow Road and Brentfield between Sylvia Gardens and First Drive, with separate low level cycle signals at junctions, new cycle crossings and better connections to other local cycle routes
  • Introducing bus stop bypasses for cyclists at bus stops C and K, with the two-way cycle lane behind the bus stop island for cyclist safety

  • Improving the quiet road cycle connections to Wembley Central and Harlesden stations

  • Improving the route for pedestrians by adding a new crossing over Brentfield near Bridge Park Community Leisure Centre and making existing crossings at the A406 junction more direct, which will reduce crossing times

  • We’ll add measures to slow traffic speeds, add better street lighting and drainage, and new areas of planting and trees where space allows along the route

  • Improving the service for bus passengers by extending bus stop D so two buses can stop here at a time, and moving stop B in line with the traffic lane so that buses can pull away easily after passengers board

  • Other changes to allow us to make these improvements include closing the left turn filter lanes from the A406 onto Harrow Road and Brentfield, making Sylvia Gardens exit only for motor vehicles (currently entrance only), shortening a parking bay on Harrow Road and reviewing parking restrictions on the quiet road connections. We would also move bus stop ‘Sunny Crescent’ 90m to the eastern side of Wyborne Way to make space for the new cycle lanes

To read about the changes we plan to make in more detail, please see summary of changes page.


How you can find out more

We would like to know what you think about our proposals. The information below is available to help you respond:

If you need to translate this page into another language, please use the ‘Select language’ button at the bottom of this page.


Drop-in events

We will be holding two in person drop-in events at Bridge Park Community Leisure Centre, Brentfield, Harrow Road, London NW10 ORG on:

  • Saturday 9 December (10:00 - 14:00)
  • Tuesday 12 December (15:00 - 19:00)

These will give you an opportunity to get further information about the proposals and provide your thoughts and feedback, to allow us to consider your views.


Equalities Impact Assessment

Our Equality Impact Assessment (EqIA) identifies:

  • The affects these proposals could have on people
  • How we propose to minimise any negative impacts

After we’ve considered all comments, the EqIA will be reviewed and may be updated.

We use the EqIA to help us decide if, and how, we should proceed with these proposals.


Connecting with London's deaf community on our consultations

British Sign Language videos of the proposals and survey are available.

To further enhance how we engage and consult with London's deaf community we are trialling a British Sign Language (BSL) consultation conversation service for this consultation. This service will allow the TfL consultation lead to have a two-way BSL translated discussion on any aspect of this consultation with a BSL speaker.

To request a BSL consultation conversation please contact us at haveyoursay@tfl.gov.uk and we will be in contact to arrange this at a convenient time. Following this trial, we will evaluate the service to determine if this is something we are able to offer on other consultations in the future.


What happens next

These proposals are subject to the outcome of our consultation. Once consultation ends on 21 December 2023, we will spend time considering all the responses we receive and will prepare a consultation report.

The report will be available to everyone that takes part in the consultation and a copy will be published on our website.



  • Background to our proposals

    Share Background to our proposals on Facebook Share Background to our proposals on Twitter Share Background to our proposals on Linkedin Email Background to our proposals link


    Image of Harrow Road and A406 junctionLarger image


    London’s population has changed dramatically over the past century and it will continue to change and grow in future. By 2031 there will be around 1.25 million more people living in London and over 750,000 new jobs. Many of the new homes that are built won’t have car parking facilities - there simply isn’t room in London for so many additional cars.

    Our vision for the route between Wembley Central and Harlesden stations is that it should be much less dominated by motor traffic and be a much less intimidating place to be for everyone.

    There is a strong case for less motor traffic and more space for walking and cycling along the route. The number of people who will be walking and cycling in London is set to continue to grow in future, and we expect that the number of people cycling in the Wembley and Harlesden area will grow too.

    We want to make the route safer and more comfortable for vulnerable road users, including pedestrians and cyclists. We’ve been talking to local people about our plans since January 2020 and we’ve reflected on these discussions in developing the proposals that we are now consulting you on.

    Our proposals are in line with our Vision Zero strategy, which aims to eradicate deaths and serious injuries from our roads. The proposals have been designed according to our Healthy Streets approach, which aims to make London a safer, healthier and greener place to live and travel.



    Click here to return to the main page

  • Summary of changes between Wembley Central and Harlesden Stations

    Share Summary of changes between Wembley Central and Harlesden Stations on Facebook Share Summary of changes between Wembley Central and Harlesden Stations on Twitter Share Summary of changes between Wembley Central and Harlesden Stations on Linkedin Email Summary of changes between Wembley Central and Harlesden Stations link

    On this page we list the changes we are proposing to make between Wembley Central and Harlesden stations.

    Maps of our proposals

    Improvements for cyclists

    Improvements for pedestrians

    Changes for bus users

    Other changes to support the improvements



    Changes to the Harrow Road and Brentfield section of the scheme

    The video shows the proposed changes on the Harrow Road and Brentfield section of the scheme where many of the most significant changes will be made to help you understand our proposals better.






    Improvements for cyclists

    Image of Brentfield by Bridge Park Leisure CentreLarger image


    • A two-way protected cycle lane (separating cyclists from general traffic with a kerb) on the A404 Harrow Road and Brentfield between Sylvia Gardens and First Drive
    • We’ll have separate low-level signals for cyclists at the proposed new pedestrian crossing on Brentfield by the leisure centre and at the A406 junction with Brentfield and Harrow Road, so it’s clear when they can pull ahead
    • Existing crossings upgraded so cyclists can also use them to cross Harrow Road at Monk’s Park and First Drive including areas where there is shared use footway
    • Bus stop bypasses introduced for cyclists at bus stops C and K, with the two-way cycle lane behind the bus stop island for cyclist safety
    • The cycleway will link to existing London Cycle Network routes (LCN45 and LCN85) making cycling journeys to neighbouring areas easier
    • Improved way finding to help cyclists along the cycleway including on quiet road connections to Wembley Central and Harlesden stations
    • Shelley Road junctions with Milton Avenue and Mordaunt Road amended to give priority to the cycle route, with give way lines added to instruct drivers to give way to cyclists
    • Cycle parking and storage to be reviewed along the cycleway route and increased where needed at the next stage of the project
    • At Wembley Brook, we'll use special mirrors to help drivers and cyclists see each other more easily



    Improvements for pedestrians

    • New push button green man crossing over the Brentfield A404 by Bridge Park Community Leisure Centre
    • The pedestrian crossings at Harrow Road junction with the A406 will be made simpler and more direct with one fewer stage to cross
    • New zebra crossing at Brentfield near its junction with First Drive
    • There will be new raised tables at most side road junctions between Wembley and Harlesden to make pedestrians and cyclists more visible and traffic slow down
    • We're reviewing street lighting to make sure it's easy to see at night, and we're planning to provide new ‘rain gardens’ where space allows which will help reduce the chance of local flooding. If there's enough space, we’ll add new trees where we can



    Changes for bus users

    Image of new bus stop bypass on Harrow RoadLarger image


    • We would extend bus stop D on A404 Harrow Road by 12 metres so two buses can stop at the same time, this will help the bus service be faster
    • We would move bus stop B ‘Stonebridge Park Station’ in line with the traffic lane so buses can pull away more easily
    • We're moving bus stops K and C onto bus stop islands and creating bus stop bypasses, with the cycle lane behind them to help avoid collisions between cyclists and bus riders
    • At stop C the cycleway will be at the back of the footway, with all pedestrian movements using the front of the footway via a zebra crossing over the cycleway
    • Bus stop ‘Sunny Crescent’ by the children’s playground (served by routes 18 and N18) to be moved 90m to the eastern side of Wyborne Way so that it is opposite the Cycle King Factory and the Hillside Centre, to make space for the new cycleway and crossing improvements
    • We'll extend the bus lane on Harrow Road by 25 metres on the south-bound side into the A406 junction, and take away a 20 metre section of bus lane on Brentfield on the north-bound side to help traffic flow through the A406 junction. All other bus lanes in the area will operate as normal




    Other changes to support the improvements

    Image of Brentfield and A406 junctionLarger image


    • We're closing the two filter lanes for traffic to turn left from the A406 into Harrow Road and Brentfield. This would give pedestrians more space and make the crossings safer and easier to use
    • Traffic can still turn left at the junction in both cases which will be increased to three lanes, but it will be easier for pedestrians to cross here
    • Sylvia Gardens (currently entrance only from Harrow Road) will become exit only to reduce the risk of collisions. Cyclists can still use it in both directions
    • We're making more room for buses at bus stop D by making a parking bay on A404 Harrow Road outside Stonebridge Park shops smaller by 12 metres
    • We're extending the 20mph speed limit on Harrow Road to east of Point Place, and adding traffic calming measures along the quiet road connections at Albert Terrace, Milton Avenue, Mordaunt Road, London Road, Tokyngton Avenue and Sylvia Gardens
    • We'll make sure all road users have clear lines of sight along the quiet road connections to Wembley Central and Harlesden Stations by adding new yellow line parking restrictions where needed (please see maps)
    • We’ll review the existing layout of the cycle lane next to the footway along Wembley Brook and will consider changing this space to a shared use footway to make sure it is as user friendly as possible for pedestrians and all types of cycles

    Overview maps and detailed maps showing the proposed changes are available.


    Click here to return to the main page

  • Maps of our proposals

    Share Maps of our proposals on Facebook Share Maps of our proposals on Twitter Share Maps of our proposals on Linkedin Email Maps of our proposals link

    On this page you can find maps showing the changes we are proposing to make between Wembley Central and Harlesden stations. The route has been split into three sections. Click on the maps to view larger versions.

    1. Wembley Central to Sylvia Gardens overview maps

    Wembley Central to Sylvia Gardens part 1 mapWembley Central to Sylvia Gardens part 1


    Wembley Central to Sylvia Gardens part 2 mapWembley Central to Sylvia Gardens part 2


    Wembley Central to Sylvia Gardens detailed maps

    You can find more detailed maps of the proposals by clicking on the links below.

    Wembley Central to London Road

    London Road to Wembley Brook

    Tokyngton Avenue Wembley Brook

    Tokyngton Avenue Tring Avenue

    Tokyngton Avenue Bovington Avenue

    Tokyngton Avenue Sylvia Gardens


    2. Harrow Road to Brentfield overview maps


    Harrow Road to Brentfield detailed maps

    You can find more detailed maps of the proposals by clicking on the links below.

    Sylvia Gardens Harrow Road

    Harrow Road junction A406

    Brentfield from Conduit Way


    3. First Drive to Harlesden station overview map

    First Drive to Harlesden station mapFIrst Drive to Harlesden station


    First Drive to Harlesden station detailed maps

    You can find more detailed maps of the proposals by clicking on the links below.

    First Drive to Stonebridge Park

    Stonebridge Park and Albert Terrace

    Albert Terrace and Milton Avenue

    Shelley Road and Mordaunt Road


  • Healthy Streets

    Share Healthy Streets on Facebook Share Healthy Streets on Twitter Share Healthy Streets on Linkedin Email Healthy Streets link

    Image of Brentfield and First DriveLarger image


    The proposals for this scheme have been designed according to our Healthy Streets approach, which aims to make London a safer, healthier and greener place to live and travel.

    The assessments below show how the different sections of the scheme meet our Healthy Streets indicators.


    Harrow Road 1 of 3 Monks Place to Points Place

    Harrow Road 2 of 3 Points Place to Conduit Way

    Harrow Road 3 of 3 Conduit Way to First Drive

    A404 High Road to east of the junction with Cecil Avenue

    London Road to Tokyngton Avenue

    Gaddesden Avenue to Sylvia Gardens

    Tokyngton Avenue to Harrow Road

    First Drive to Stonebridge Park

    First Drive to Albert Terrace

    Albert Terrace to Shelley Road

    Shelley Road to Winchelsea Gardens



    Click here to return to the main page

Page last updated: 22 Dec 2023, 07:50 AM